Poor data authenticity
Poor data authenticity makes it difficult for management to allocate field resources such as material procurement, human resources and cash flow efficiently.
-
High travel cost
Human-monitored management is difficult, walking management cannot be completely covered, and frequent on-site travel costs are high.
-
It is difficult to obtain evidence afterwards
Project safety management has heavy tasks, many emergencies, lack of effective data records, and difficulty in obtaining evidence afterwards.
-
Reduce travel and save time
Remote real-time view of the construction site, allowing more professional engineers to participate in the same project, saving the economic and time costs of travel.
-
Keep cooperation and improve efficiency
With the information of images and plane navigation and positioning, complete records can be generated, the export of customized reports can be supported, and WeChat/engineering management software can share them quickly, with one-click collaboration.
-
Release BIM application potential
The real scene of Project 360 is linked with the plan and BIM as a communication tool between project participants, which effectively guides the site construction.
-
Objective data,helps clear up the work
Objective, authentic and complete data records, feedback the actual progress, help all parties reach a consensus quickly, and serve as the basis for settlement.
-
100% complete construction image whole process record
-
Reduce destructive maintenance construction by 80%
-
Reduce the inspection time of the existing construction site by more than 60%