Panorama +AI assists the owner Establish a visual digital asset in the whole process
Track the latest progress of the project in real time and grasp the latest situation of the project with one click; Digital archives assist operation and maintenance, so that every construction link can be effectively recorded.
We will solve your problems such as
  • Low monitoring coverage

    The coverage rate of indoor monitoring in traditional construction site is low, so it is impossible to grasp the real situation of construction site in time;

  • Hard accountability for concealed works

    It is difficult to trace the field data of key nodes and fully record the concealed works. If there are quality risks in the later period, it is hard to hold someone’s accountable.

  • Uncontrollable budget for a project

    The traditional human-monitored management has high cost and low efficiency, the project construction progress is difficult to grasp, and frequent changes and counter-work lead to budget overruns.

Panorama +AI assists the owner to establish the whole process visual digital assets.
  • Keep abreast of the project progress

    Get 360-degree real-life data of the project anytime and anywhere through the APP or the WEB, and grasp the latest progress of the project with one button.

  • Deliver on time to prevent overspending

    Real-time progress tracking, better grasp the construction period, efficient and objective real data recording, reduce the amount of changes and rework and save the budget.

  • Automatic recording lets the work leave a mark

    Facing the enlarged management radius, the patrol on the cloud can still find the risk points in advance and avoid losses; Effective records of each construction link will assist remote acceptance.

  • Digital archives assist operation and maintenance

    Complete visual construction records provide more detailed reference for the owner/property management team in decoration and equipment and facilities operation.

Application Value
  • 100% complete construction image whole process record
    100% complete construction image whole process record
  • Risk points reduced by 75%
    Risk points reduced by 75%
  • The rework amount of construction change is reduced by more than 50%
    The rework amount of construction change is reduced by more than 50%